Article sections
Mains monitoring over a longer period of time means that a huge amount of data needs to be collected. If analysis of such data is to be possible at all, it is necessary to introduce the mechanisms which will reduce the data size to the values acceptable by both, people and computers.
For EN 50160 compliant power quality measurements, the basic mains test period is one week.